Product Description
Part Number: 3051CD2A03A1BM5B1I1H7P1Q4
Ordering Information
NOTE:
Select Configuration Buttons (option code D4 or DZ) or Local Operator Interface (option code M4) if local configuration buttons are required.
Option HR5 configures the HART output to HART Revision 5. Option HR7 configures the HART output to HART Revision 7. The device can be field configured to HART Revision 5 or 7 if desired. HART Revision 5 is the default HART output.
Materials of Construction comply with recommendations per NACE MR0175/ISO 15156 for sour oil field production environments. Environmental limits apply to certain materials. Consult latest standard for details. Selected materials also conform to NACE MR0103 for sour refining environments.
Panel mounting bolts are not supplied.
Dust approval not applicable to Output Code X.
Requires 0 code in Materials of Construction for Alternate Process Connection.
Estimated Lead Time: 4 - 6 Weeks
Shipping Weight: 6 Kg
Ordering Information
NOTE:
Select Configuration Buttons (option code D4 or DZ) or Local Operator Interface (option code M4) if local configuration buttons are required.
Option HR5 configures the HART output to HART Revision 5. Option HR7 configures the HART output to HART Revision 7. The device can be field configured to HART Revision 5 or 7 if desired. HART Revision 5 is the default HART output.
Materials of Construction comply with recommendations per NACE MR0175/ISO 15156 for sour oil field production environments. Environmental limits apply to certain materials. Consult latest standard for details. Selected materials also conform to NACE MR0103 for sour refining environments.
Panel mounting bolts are not supplied.
Dust approval not applicable to Output Code X.
Requires 0 code in Materials of Construction for Alternate Process Connection.
Estimated Lead Time: 4 - 6 Weeks
Shipping Weight: 6 Kg




